Five to 10 years: Address some rust on steel lintels, replace exterior windows, replace/repair exterior doors and make bathrooms ADA accessible.
Central Elementary School
Zero to five years: Perform some brick repointing and cleaning needed, replace sealants, repair gutter and downspouts.
Five to 10 years: Replace exterior windows, repair/replace exterior doors, make classrooms’ bathrooms ADA accessible and perform electric work that includes replacing branch panels and circuits.
Amherst Elementary School
Zero to five years: Perform some brick repointing and cleaning needed, repair gutter and downspouts.
Five to 10 years: Replace exterior windows, repair/replace exterior doors; make classroom bathrooms and school’s stage ADA accessible, replace door hardware, install mixing valves at lavatories, replace toilet fixtures.
Amelon Elementary School
Zero to five years: Perform some brick repointing and cleaning needed, repair gutter and downspouts.
Five to 10 years: Replace exterior windows, repair/replace exterior doors, replace some door hardware, make classroom bathrooms ADA accessible, install mixing valves at lavatories, replace electric panels and add fire alarm devices.
Amherst Middle School
Zero to five years: Regrade slope and repair damaged foundation, floor slab and wall.
Five to 10 years: Perform some brick repointing and cleaning needed, repair gutter and downspouts, replace exterior windows, replace door hardware, make bathrooms ADA accessible, install mixing valves at lavatories, replace some toilet fixtures and install additional fire alarm devices.